Project Detail

PEPCO

pepco

Project Detail

Project Location: Riverdale Substation, 4519 Madison Street, Riverdale, Md.
Contract: PEPCO Riverdale Substation Expansion
Owner: PEPCO
Project Supervisor: Rockie Paras
Original Contract Value: $1,835,700
Revised Contract Value: $2,123,182
Completion Date: November 2014

Description of Work:

Anchor Construction was brought on by PEPCO to furnish and install a substation expansion in Riverdale, Md.

Major work included:

  • Furnished and installed:
    • (3) EA-transformer and containment structures
    • Column and footing foundations
    • Oil reclaim and structure with 7’x17’x9′ inside headroom
    • (2) EA-PEPCO inline manholes with 6’x12x7′ headroom
    • (1) EA-Petro barrier with 6″ outfall
    • Steel, brick and blocking for new building
    • Approx. 500 TF of various size conduit section from one-way to 12-way and grounding
    • Approx. 185 linear feet of iron fencing and 210 linear feet of chain-link fencing
  • Installed:
    • 2″ sump pump and piping
    • 7′ wide Bio-Swale with 6″ underdrain
    • Approx. 450 SY of new asphalt pavement and landscaping